NUFC Fan Zone Stack

KWJ were brought in to initially help erect the steel frame as there were many issues with set out and design. Being one of the only companies on this project with the correct height training/qualifications KWJ then spent many weeks often late nights welding extra stubs and brackets into positions. During the time on site there were many design changes; i.e. the frontal signage frame and the main door opening frames; these had to be cut down and modified on site.